Axis3D Automated Monitoring (AMO) at the reconstruction of the station concourse in Salzburg (Austria)
Kops II - one of the largest construction sites of hydroelectric power plants in Europe:
Application of
Axis3D Geotechnical Measurements (GTM), Axis3D Construction Surveying (COS), Axis3D Monitoring (MON) and
Axis3D SET Sets of Angles (SET)
Axis3D Automated Monitoring (AMO):
Permanent monitoring of the highway tunnel Niklasdorf (Austria)
Brenner Base Tunnel (at 64 km in length, it will be the longest underground railway line in the world):
Application of
Axis3D Motor Laser System (MLS) and
Axis3D Construction Surveying (COS) at the construction of the reconnaissance gallery
Application of
Axis3D Deformation Graphics 3D (DG3) at the hydroelectric power plant Feldsee (Austria)
Application of
Axis3D Motor Laser System (MLS) and
Axis3D Geotechnical Measurements (GTM) at the construction of the Devils' Slide Tunnel (California)
Extension of the metro U1 in Vienna (Austria): Application of
Axis3D Automated Monitoring (AMO),
Axis3D Deformation Graphics Online (DGO) and
Axis3D Deformation Graphics 3D (DG3)
Application of
Axis3D Motor Laser System (MLS) and
Axis3D Construction Surveying (COS) at the construction of the Götschka Tunnel (Austria)
Application of
Axis3D Swept Path 3D (SP3),
Axis3D Deformation Graphics 3D (DG3) and
Axis3D Network Adjustment (NET) at the refurbishment of the hydroelectric power plant Lutz (Austria)